Home
Category
TV Live Menu
Loading data...

Wind and Solar Power Plants That May Be Built in Georgia – List

no photo
BM.GE
26.05.21 20:00
1874
The Georgian State Electricsystem estimates the potential of 20 solar and wind power plants. The construction of these stations is conditionally scheduled for the next ten years.
 
According to the state power system document, the total output of these power plants should be 1257 MWh - for comparison, this electricity is almost equal to the output of the Enguri hydropower plant, but due to its specificity, for example, a solar station only - during the day, and a wind station will operate only in an appropriate climatic conditions.
 
Despite the state power system's assessment of 20 potential power plants, it is unknown whether these projects will be implemented.
 
At present, there is only one alternative energy power plant operating in Georgia - a 21-megawatt Gori wind farm, which was created by the state with a loan from the EBRD and was put into operation in December 2016.

Alternative power plants, the completion of which is expected in the next 10 years (most of the projects are quite far from the start of implementation):
 
1) Imereti 1 (wind) - 300 MW, estimated date of commissioning 2023
2) Ricotta (wind) - 65 MW, estimated date of commissioning 2023
3) Background - 25 MW, estimated date of commissioning 2023
4) Central Wind Power Plant (Imereti) - 120 MW, estimated date of commissioning 2023
5) Nigoza wind power plant (Shida Kartli) - 40 MW, estimated date of commissioning 2023
6) Tbilisi Wind Power Plant - 49.5 MW, estimated commissioning date 2023
7) Kaspi Wind Power Plant - 50 MW, estimated date of commissioning 2023
8) Kartli wind power plant 2 - 100 MW, has no estimated date of commissioning
9) The first wind power plant (Shida Georgian) - 110 MW, has no estimated date of commissioning
10) First Wind Power Plant 1 (Shida Kartli) - 30 MW, has no estimated date of commissioning
11) Saakadze (wind, Kvemo Kartli) - 15 MW, has no estimated date of commissioning
12) Zemo Kari Power Plant (Shida Kartli) - 11 MW, has no estimated date of commissioning
13) Tkibuli wind power plant - 50 MW, has no estimated date of commissioning
14) Martkopi wind power plant - 50.4 MW, has no estimated date of commissioning
15) Kutaisi wind power plant - 50 MW, has no estimated date of commissioning
16) Flevi Wind Power Plant (Shida Kartli) - 34.5 MW, no estimated date of commissioning
17) Desert Solar Power Plant - 5 MW, estimated commissioning date 2021
18) Gareji Solar Power Plant - 15 MW, has no estimated date of commissioning
19) Tbilisi Solar Power Plant - 50 MW, has no estimated date of commissioning
20) Sagarejo Solar Power Plant - 25 MW, has no estimated date of commissioning.