Home
Category
TV Live Menu
Loading data...

GEL 1.1 MLN Allocated for Bridge Rehabilitation on Ozurgeti-Natanebi-Ureki Road

სახიდე გადასასვლელი
Natiko Taktakishvili
23.10.26 13:30
• 56

The state budget has allocated GEL 1.1 million to rehabilitate the bridge over the Meria River on the Ozurgeti-Natanebi-Ureki road at kilometer 9. According to the Roads Department, rehabilitation works are nearing completion.

The existing single-span bridge, measuring 23.1 meters in length, was in unsatisfactory technical condition and required renovation.

The project has improved the bridge’s technical specifications, including its load-bearing capacity and span length to ensure smoother water flow. The bridge piers and regulation walls have also been built on pile foundations.

Subscribe to our news

Get the main news of the day